Simes Bridge

Simes bridge required flood repair work to a bridge abutment relieving slab that had been undermined. In the early hours of 5 March 2026, a measured exercise was undertaken where the road was closed to excavate out the temporary rock fill installed in 2022, the failed abutment and relieving slab, ...

Airstrip Stabilisation

This remote airstrip project required stabilisation of a problematic length of pavement and completion of a sprayed seal to produce an operational ...

Coomera Connector Stage 1 North

This 4km section of the project will include: 4 lanes with provision for future widening into the centre median to 6 lanes. Bridges will be future-proofed to 6 lanes to help minimise future construction impacts to adjacent residents and the travelling public grade-separated interchanges at ...

Mount Lindesay Highway

This project involved upgrading part of the Mount Lindesay Highway from 2 to 4 lanes between Stoney Camp Rd and Chambers Flat Rd. Works included new northbound and southbound bridges over Norris Creek, safety improvements (including the installation of safety barriers) and implementing improved ...